RENOVATION VIDEO

Renovation of a listed building. We show you how easy it is to install a wall heating-wall cooling module.  
>> show video << 

 

Hang up pictures?

The pipes are easy to locate with the Variotherm pipe locator or using thermofoil.

 

 

THE MODULAR WALL

The ModulePanels are fixed to metal or wood support structures.

 

Hang up pictures?

The pipes are easy to locate with the Variotherm pipe locator or using thermofoil.

THE MODULAR CEILING

Due to lack of space a ceiling cooling/heating system was installed in the meeting room.

 

 

THE MODULAR WALL

The ModulePanels are fixed to metal or wood support structures.

 

Hang up pictures?

The pipes are easy to locate with the Variotherm pipe locator or using thermofoil.

DIVERSION IN THE CABLE DUCT

The supply pipes were diverted to avoid costly drilling work.

 

 

THE MODULAR WALL

The ModulePanels are fixed to metal or wood support structures.

GROUTING THE PIPES

The pipe connections are 100 % tight. Once pressed, they last a lifetime.

EASY INSTALLATION IN THE WC

The ModulePanel was mounted laterally as a design element

Practical test by designers
of
Fullscreen

Variotherm >  References  >  Practical test by designers

Projektbeschreibung

Practical test by designers

The venerable old building of the former branch of the Austrian National Bank in Eisenstadt can look back on an eventful history. Built in 1924 in Art Deco style, it forms an architectural contrast to Esterházy Palace opposite, and is currently listed for preservation.

For the last 50 years, the building was heated with a monstrous oil heating system. In the end, it was high time for a new heating system. One of the most important requirements of the Department for the Protec-tion of Historic Buildings was that the studio's 170 m² original oak parquet floor from the 1920s must remain intact.

"We wanted a solution that would add value for the premises in the long term. That is why we chose an air heating pump combined with a ModuleWall and ModularCeiling for heating and cooling," explained the two desi-gners. Another pleasant side-effect was that the old radiators vanished from the studio. Besides the aesthetically appealing design, the expected savings in heating costs were of course a key criterion.

The closure of the office was to be as short as possible. In cooperation with an experienced drywall construction expert, the entire project was implemented in just 10 days. The renovation was coordinated by Peter Unterrainer (Variotherm). The heating distribution manifold was set up and the heat pump was connected by a specialist installation company.

Variotherm products:

Watch the VIDEO here.